This week's progress is less than stellar. We patched up 1 hole from the previous demo to get to the radiant heat pipes. The counter tops have been ordered and should be installed in 2 weeks. The glass for the shower in the master bedroom is being quoted as we finalize the trim options. This has turned out to be a lot more complicated than I had thought. The door trims and baseboard are being installed (Wed, Thurs, Friday)--Progress is SLOW.