Up QuinceProject » Our House Remodel Project » Week 20 - Feb 4, 2008 Slideshow

This week are focusing on putting the 2nd and third coat of paint on both exterior and interior. The bathroom tiles will be laid out. The electrical switches and plugs will be installed. We are installing one last pocket door on Friday. The 2nd bathroom originally had a door, but after it was installed, we realized that there isn't room for someone to stand in there and close the door without hopping into the shower tub first! Doh! So I have asked the contractor to put a 28" pocket door. This will allow the kids to use the bathroom at the same time.