The last several weeks, the progress has moved rather slowly. This week work picks up. We are scheduled to have the fireplace installed and inspected. The drywall is receiving the 5th coat of joint compound, and the last piece of electrical will be completed. The center island needs to be connected by opening a channel on the concrete from the wall to the center island.